Solar design takes too long. we fix that.

Kriya Partners

If you're closing deals and then watching projects stall before they get built, the problem usually isn't the install. It's everything before it.

What we do

We handle the work that slows projects down

Permitting. Interconnection. Design revisions. Resubmissions. Every week those things sit in the pipeline adds cost and eats margin. Kriya plugs into your operation after the sale and moves that work forward - design, engineering, permitting, and interconnection, end to end.

  • Plan set design
  • Engineering — all 50 states + territories
  • Permitting applications
  • Interconnection applications
  • Project feasibility kits
  • Procurement & partner matching
  • Environmental studies
  • Post-sale project management

We work across solar, battery storage, EV charging, and microgrids. If it needs to get permitted, engineered, and interconnected, that's what we do.


Why timing matters

The 2027 ITC step-down isn't abstract anymore

Developers and installers who can't move projects from sale to commissioning fast enough are going to leave money on the table - or lose deals to people who are more efficient. The pressure to keep margins is already high. Slow timelines make it worse.

Most companies handle this one of two ways: doing designs in-house, which is slow and expensive to build and maintain, or outsource it to a generalist who more often than not, doesn't know the specific utilities, AHJs, or market conditions they're working in. Both options are not ideal for your timeline or your bottom line.

The biggest soft cost in solar usually isn't the engineering invoice. It's the weeks your team spends chasing permits, resubmitting applications, and waiting on AHJs while projects sit still.


How we're different

We're operators, not a platform

We're not a software tool asking you to upload documents and wait. We're real people who know where applications get stuck, which utilities have quirks, and how to move a project that's sitting on hold. We handle it the way we'd handle our own work.

The goal is straightforward: cut weeks off your timeline, reduce soft costs, and keep your margins intact as the market shifts and tightens.


Who we work with

Built for developers and installers who need to move faster

Commercial solar developers, installers, EPCs, schools, public agencies, and commercial property owners across the U.S. If you're deploying energy infrastructure and need to move faster without building out a full in-house team, that's what we're built for.

If you have projects that should be further along than they are, let's talk. One conversation is usually enough to figure out where the time is going.

Get in Touch
Next
Next

What is a solar interconnection agreement? and why does it matter?